GESCOM Recruitment 2022: Gulbarga Electricity Supply Company Limited has released a notification for 135 Graduate & Diploma Apprentice 2022. Those Interested in this announcement and with all the needed credentials can go through the announcement completely and apply Offline Form.
Gulbarga Electricity Supply Company Limited
Name of the Post: | GESCOM : Graduate & Diploma Apprentice |
Post Date: | 30-11-2022 |
Total Vacancy | 135 |
Application Mode | Offline Form |
GESCOM Recruitment 2022 – Karnataka
135 vacancies
Graduate & Diploma Apprentice
Age Limit
Minimum Age | 18 years |
Maximum Age | 58 Years |
Age Relaxation is applicable in accordance with the rules.
Application Fee For GESCOM Recruitment
- Not mentioned in the Notification
Important Dates
The online application starts on | 21-11-2022 |
Last date for application | 08-12-2022 |
Eligibility
- Applicant must have Diploma / B.E
Vacancy Details
No | Name of the Post | No of Vacancy |
---|---|---|
1 | Graduate Apprentice | 100 |
2 | Diploma Apprentice | 35 |
Kindly read the complete notification before applying.
Main Links
Download the official notification | Click Here |
Official Website | Click Here |
About GESCOM Recruitment – 135 Graduate & Diploma Apprentice Best Job Vacancy 2022
The erstwhile Mysore State had the enviable and superb role of organizing the primary fundamental hydroelectric producing station for business operations at Shivasamudram as early as 1902. The artwork at that point turned into nevertheless in its infancy, even with inside the superior countries. The longest transmission line, at the best voltage with inside the world, turned into built to satisfy the strength desires of mining operations at Kolar Gold Fields. GESCOM Recruit
The producing potential of the Shivasamudram Power House step by step elevated to forty two MW in stages. To meet the growing call for for strength, the Shimsha Generating Station, with an set up potential of 17.2 MW, turned into commissioned with inside the yr 1940.
The strength call for turned into ever at the growth, for industries and rural electrification, and additions to producing potential have become imperative. The 1st Stage of forty eight MW and second degree of seventy two MW of the Mahatma Gandhi Hydroelectric Station had been commissioned in the course of 1948 and 1965, respectively. GESCOM Recruit
he State of Karnataka, with availability of reasonably-priced electric powered strength, and different infrastructure facilities, turned into conducive for elevated pace of business activity. It have become vital to enhance the strength-producing potential via way of means of harnessing the complete ability of the Sharavathi Valley.
The first unit of 89.1 MW turned into commissioned in 1964 and finished in 1977. The call for for strength noticed an exceptional growth with inside the mid sixties and on wards with the putting in of many public region and personal industries with inside the State. GESCOM Recruit
As strength technology with inside the kingdom turned into completely depending on monsoon and turned into concern to its vagaries, the kingdom authorities installation a coal primarily based totally strength plant at Raichur. The gift set up potential of the strength plant at Raichur is 1470 MW.
To increase the electricity sources of the State, the Kalinadi Project with an set up potential of 810 MW at Nagajhari Power House and 100MW at Supa Dam Power House, with an electricity ability of 4,112 MWh, had been installation. The transmission and distribution machine with inside the kingdom turned into beneath neath the manipulate of the Government of Karnataka (then Mysore) until yr 1957. In the yr 1957, MSEB turned into shaped and the personal distribution agencies had been amalgamated with Karnataka Electricity Board. GESCOM Recruit
Till the yr 1986, KEB turned into a profit-making organization. However, with inside the next years, like different State Electricity Boards with inside the country, KEB additionally commenced incurring losses, specifically because of the growth in agricultural intake and because of the implementation of the socio-financial rules of the authorities. To enhance the overall performance of the strength region and in song with the reforms initiated via way of means of Government of India, the Government of Karnataka got here out with a preferred coverage offering essential and radical reforms with inside the strength region. GESCOM Recruit
Accordingly an Act, specifically the Karnataka Electricity Reforms Act turned into handed via way of means of the Karnataka Legislature. The Reform has mandated fundamental restructuring of the Karnataka Electricity Board and its Corporation. As a part of corporation, Karnataka Electricity Board ceased to exist and Karnataka Power Transmission Corporation Limited turned into constituted on 1st August 1999. GESCOM Recruit
FAQ
What is the full form of GESCOM?
GESCOM full form is Gulbarga Electricity Supply Company Limited
How to Apply for GESCOM Govt Jobs 2022?
Eligible candidates apply ofline for GESCOM website